USGS OF 62-103
Publication Details
Title:
Potential effects of Project Chariot on local water suppliesAuthors:
Piper, A.M.Publication Date:
1962Publisher:
U.S. Geological SurveyOrdering Info:
USGS Publications WarehouseQuadrangle(s):
De Long Mountains, Noatak, Point Lay, Point Hope
Bibliographic Reference
Piper, A.M., 1962, Potential effects of Project Chariot on local water supplies: U.S. Geological Survey Open-File Report 62-103, 76 p., 18 sheets, scale 1:250,000.
Publication Products
-
Report Information- of62-0103.pdf (2.2 M)
-
Maps & Other Oversized Sheets- Plate 1 Vicinity of the Chariot site (478.0 K)
- Plate 2 Expected fallout pattern and wind roses, Project Chariot (47.0 K)
- Plate 3 Profiles of representative streams, vicinity of the Chariot site (28.0 K)
- Plate 4 Points sampled for analyses of water, sediment, and stream deposits, scale 1:250,000 (378.0 K)
- Table 2 Sheet, 1 Assumed distribution of fission-product activity from Project Chariot, after 1 hour (88.0 K)
- Table 2 Sheet, 2 Assumed distribution of fission-product activity from Project Chariot, after 1 hour (61.0 K)
- Table 9 Classification of land surface, vicinity of the Chariot site (51.0 K)
- Table 17 Fraction of activity assumed to be removed from solution by adsorption on land-surface materials, Project Chariot (53.0 K)
- Table 18, Sheet 1 Expected dispersal of fission products in fallout from Project Chariot, case I (123.0 K)
- Table 18, Sheet 2 Expected dispersal of fission products in fallout from Project Chariot, case I (92.0 K)
- Table 19, Sheet 1 Expected dispersal of fission products in fallout from Project Chariot, case II (96.0 K)
- Table 19, Sheet 2 Expected dispersal of fission products in fallout from Project Chariot, case II (77.0 K)
- Table 20, Sheet 1 Expected dispersal of fission products in fallout from Project Chariot, case III (76.0 K)
- Table 20, Sheet 2 Expected dispersal of fission products in fallout from Project Chariot, case III (58.0 K)
- Table 21, Sheet 1 Expected initial dispersal of fission products in fallout from Project Chariot, Case IV (89.0 K)
- Table 21, Sheet 2 Expected initial dispersal of fission products in fallout from Project Chariot, Case IV (68.0 K)
- Table 22, Sheet 1 Expected re-dispersal of fission products in fallout from Project Chariot, Case IV (111.0 K)
- Table 22, Sheet 2 Expected re-dispersal of fission products in fallout from Project Chariot, Case IV (88.0 K)